اتصل بنا

الصفحة الرئيسية   /   اتصل

Phase Planning for Open Pit Coal Mines through

Based on the basic framework from a previous research for metal mines,we have developed a phase planning method A dynamic optimization method was created to address the production schedule issue in an open-pit coal mine while taking into account the characteristics of the fuzzy structured element. The fuzzy Frontiers Dynamic optimization of open-pit coal mine

احصل على السعر

Monitoring and prediction of dust concentration in an

Open-pit mining is an important method for extracting mineral resources, and it involves operations including perforation, blasting, loading, transport, and soil The open pit mine production scheduling problem determines a sequence of three-dimensional, notional block extraction that maximises net present value (NPV) of future cash flows and satisfies technical and operational Review of Solution Methodologies for Open Pit Mine

احصل على السعر

Research on production capacity planning method of open-pit

To plan the production capacity of open-pit coal mines, according to the occurrence of each coal seam in the mining boundary (as shown in Fig. 1), this paper studies the Open pit mining refers to mining directly on the ground surface, thereby producing an open pit. This method is practical and cost-effective when the uranium ore is located Open Pit Mining an overview ScienceDirect Topics

احصل على السعر

OPTIMISING THE OPERATIONAL ENERGY EFFICIENCY OF AN

Open-pit coal mining methods are reviewed to select the most common subsystems that represent the primary operation and energy consumption, excavation and Despite the trend of a transition to “clean” energy, the coal industry still plays a significant role in the global economy. The constant need for raw materials and energy for production leads to an An Overview of Carbon Footprint of Coal Mining to

احصل على السعر

of South African open cast coal mine highwalls

Open cast mining has been practiced in South Africa since the late 1970s under near ideal geotechnical conditions. In the past decade, with the exhaustion of the traditional South African coal fields, geotechnical conditions have deteriorated. In addition, the nature of the open cast coal mining industry is changing from the conven-Open pit mining method is one of the surface mining methods that has a traditional cone-shaped excavation and is usually employed to exploit a near-surface, nonselective and low-grade zones Open Pit Mining IntechOpen

احصل على السعر

Mining and Stripping of Open Pit SpringerLink

Download reference work entry PDF. Mining and stripping of open pit is the method of stripping rocks and mining ores from open-pit mine according to a certain mining order. In open-pit mining, there is little difference between the process of stripping rock and mining ore. The equipment on a working bench can be used for both mining Open pit mining is based on dynamic operations within the open pit, with the haulage operation being the most decisive in terms of the cost and the overall productivity of the operation. A vital aspect for the success of the haulage operation are the conditions of the roads, which change over time due to wear and tear. The present work Modeling Productivity Reduction and Fuel Consumption in Open-Pit Mining

احصل على السعر

slope: The Manglai open-pit coal mine Landslide mechanism and

Open-pit mining is a frequently used method to develop mineral resources, and the landslide disasters of high and steep slopes caused by mining are directly related to the vitality of mines (Carlà et al., 2018; Li et al., 2019; Vinoth and Ajay Kumar, 2014). For example, the landslide accident at the Shengli East No. 2 open-pit where: H 1 —the height of the lower interbed, m; H 2 —the height of the upper interbed (between the second and the third seams), m. The lower part of quarry field with a height of 35–55 m comprises two flat seams and is being processed by dragline mining method. As for the volume of coal production it is the leading one, as it provides Justification of Open Pit Mining Technology for Flat Coal Strata

احصل على السعر

Open-pit mining

Rock blasting at the large open-pit Twin Creeks gold mine in Nevada, United States.Note the size of the excavators for scale (foreground, left), and that the bottom of the mine is not visible. The giant bucket-wheel excavators in the German Rhineland coal mines are among the world's biggest land vehicles.. Open-pit mining, also known as open-cast or open Coal mining Underground, Surface, & Drilling: The various methods of mining a coal seam can be classified under two headings, surface mining and underground mining. Surface and underground coal mining are broad activities that incorporate numerous variations in equipment and methods, and the choice of which method to use in Coal mining Underground, Surface, & Drilling Britannica

احصل على السعر

Phase Planning for Open Pit Coal Mines through Nested Pit Generation

This paper presents a phase planning method specially designed for coal deposits with nearly horizontal, bedded coal seams. The geology of this type of deposit is modeled into a column model, instead of a block model, to avoid coal-rock mixing in blocks. A nested pit generation algorithm is developed for producing a series of nested, least In the following, an overview of recent research papers relevant to management of open-pit ST system is presented in chronological order. Young and Rogers [ 20] devised a high-fidelity Recent Research Agendas in Mining Equipment

احصل على السعر

Sustainability Free Full-Text Spatial Patterns, Possible Sources

Intensive mining activities in large-scale opencast coal mines have had a significant impact on the local environment. Elements that are potentially harmful to the environment are brought to the surface from deep underground, altering the geochemical conditions for their transport and redistributing them to the surface, causing serious local In this study, a solar-powered multipoint network monitoring method was used to record dust-particle concentrations and meteorological indicators in the Anjialing open-pit coal mine in the Analysis of the Dust-Concentration Distribution Law in

احصل على السعر

Frontiers Dynamic optimization of open-pit coal mine

A dynamic optimization method was created to address the production schedule issue in an open-pit coal mine while taking into account the characteristics of the fuzzy structured element. The fuzzy mining capacities of all “geologically optimal push-back bodies” were then examined using the moving cove method. One of the most crucial As the province most abundant in mineral resources in China, Inner Mongolia has more than 200 open-pit coal mines. The coal mining activities seriously hinder the sustainable use of regional land and the improvement of residents’ wellbeing. Taking 13 typical open-pit coal mines of Inner Mongolia as the study area, combining The Landscape Pattern Evolution of Typical Open-Pit Coal Mines

احصل على السعر

Study on Crust-Shaped Dust Suppressant in Non-Disturbance Area of Open

Dust pollution in open-pit coal mines severely restricts the green development of mines. Therefore, dust control has become an important requirement for the sustainable development of the mining industry. With the goal of dust pollution prevention and control in open-pit coal mines, this paper puts forward the concept of a non A clear understanding of landslide mechanisms and stability analyses is of great significance for landslide monitoring, prediction, and control. A large-scale end wall landslide occurred and its area reached 47,752 m2 on August 7–20, 2020, in the Manglai open-pit coal mine, China. In this paper, the engineering geological survey, mechanical Frontiers Landslide mechanism and stability of an open-pit

احصل على السعر

Research on Ecological Effect Assessment Method of Ecological

Open-pit mining is an important form of coal mining in China, and its damage to the ecological environment is particularly obvious in alpine regions. The ecological restoration of alpine open-pit coal mines faces severe challenges, and its restoration effect will directly affect the ecological security of China. Meanwhile, At present, the open-pit coal production of China ranks second in the world (Wang Citation 2014) and is developing toward a large-scale direction.It has been proven that large-scale open-pit coal fields are concentrated in Xinjiang, Inner Mongolia, and other ecologically vulnerable areas (Jiskani et al. Citation 2021).Green mining is the theme of coal mining Full article: A research on dust suppression mechanism and application

احصل على السعر

Study on Optimization of Coal Truck Flow in Open-Pit Mine

A semicontinuous process system consisting of a single-bucket excavator, truck, crushing station, and belt conveyor is the main coal mining process system of a large-scale hard coal open-pit mine. Through analyzing the coal mining production process, the key issues of coal mining truck flow optimization are obtained. Statistical

احصل على السعر