Optimization of Shovel-Dumper Combination in an Open

Optimization of Shovel-Dumper Combination in an Open Cast Mine using Simulation Software. International Journal for Research in Applied Science and Engineering 2019 • mehrnaz mohtasham In order to improve the efficiency of truck-shovel transportation systems and to decrease the relevant operational cost, an appropriate truck dispatching Optimization of Shovel-Dumper Combination in an Open

احصل على السعر

Shovel–Dumper system and their subsystems ResearchGate

Download scientific diagram Shovel–Dumper system and their subsystems from publication: Reliability-based analysis of probability density function and failure rate of the The optimum distance between toe of shovel-dumper dump and that of dragline dump depends on site specific geo-technical parameters of dump material, mine floor inclination, water table profile...(PDF) Stability Analysis to Reduce the Distance

احصل على السعر

Overall Equipment Effectiveness of Shovel-Dumper

Overall equipment effectiveness can be used as a tool to measure the performance and utilization of shovel-dumper operation in opencast mines. Authors of The shovel dumper system is used for the transportation of ore within the mine to improve the productivity of the Indian surface mines. To meet the production Reliability, availability and maintainability study of 6.5 cubic

احصل على السعر

Model based reliability analysis of shovel dumper system’s

In a surface coal mine, efficient usage of shovels and dumpers should be most reliable and available to reach their production target. Keeping this in mind, this study was carried out This newsletter affords a new analytic calculation for the shovel–dumper combination in open cast limestone mine evolution of the only and two galaxy probability density function (PDF).Evolution of the probability distribution function

احصل على السعر

Optimization of shovel-dumper system in surface mines by

This paper addresses application of match factor method for optimization of shovel-dumper fleet in surface mine projects. A surface iron ore mine was simulated The research article presents a reliability-based analysis of probability density function, and the failure rate of a shovel-dumper system was determined based on Weibull distribution in an open cast coal mine. Referring to the bathtub-model along with the Weibull distribution of a shovel and dumpers, decreasing, constant and increasing failure Reliability-based analysis of probability density function

احصل على السعر

(PDF) Use of Machine Learning Algorithm Models to

In surface mining operations, the dumper haulage system contributes the most to the total operating cost of any mine. It is estimated that an average mining company spends around 50% to 60% onIn this article one shovel (S1: Komatsu shovel, capacity: 12 cubic meters) and four dumpers (D1, D2: BEML dumper & D3, D4: Komatsu Dumper, capacity: 100 Tones each) were considered based on the match factor i.e., 1:4. In this case study, the field data namely, failure frequency, MTBF and MTTR of the shovel-dumper system (S1, D1, D2, D3Mathematical Modelling of Engineering Problems

احصل على السعر

Reliability-based analysis of probability density function

failure statistics of shovel and dumper (Dubey et al. 2015). The accumulated failure statistics are identical to the data expected via Eq. (3 ) noted below (Zhang et al. 2016): The summary of the failure data of a shovel (i.e., KS1) and dumpers (i.e., BD1, BD2, KD3 and KD4) from the eld such as several failures, MTBF is shown in To get started, consider the following five factors. 1. Size, Weight Class & Tail Swing. Size is one of the most important specifications to consider when comparing excavator models. To get the most out of your machine, ask whether the desired excavator is the right size to perform the tasks at hand.How to Choose the Right Excavator Construction Business

احصل على السعر

Application of MR and ANN in the prediction of the

shovel, dumper operation, cycle time, MR, ANN, match factor. Introduction India is the second-largest coal producer in the world, with around 7.9% of global coal production in 2018You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long. 1 Commit. 1 Branch. 0 Tags. 324 MiB . Tag: Branch: Tree: master. Branches Tags ${ item.name } Create tag ${ searchTerm } sbm/sbm opencast al mining by shovel dumper and dragline

احصل على السعر

(PDF) Application of MR and ANN in the prediction of the shovel

The utilization of shovel and dumper needs to be optimized to reduce material handling costs and increase the commercial viability of the mines. Chaowasakoo, et al .shovel, dumper operation, cycle time, MR, ANN, match factor. Introduction India is the second-largest coal producer in the world, with around 7.9% of global coal production in 2018Application of MR and ANN in the prediction of the

احصل على السعر

Evolution of the probability distribution function of shovel–dumper

version has been developed t o predict the PDF for the same shovel–dumper system and compared with the real acquired f ee of RWB. It w as found that the values of RMSC and R 2 had been 5.96e−5This newsletter affords a new analytic calculation for the shovel–dumper combination in open cast limestone mine evolution of the only and two galaxy probability density function (PDF). To broaden a Evolution of the probability distribution function

احصل على السعر

DETERMINATION OF SHOVEL -TRUCK

Given that the truck fill factor of the classic Shovel-Truck system tends to be approximately 90% on average [29], raising this to close to 100% represents a significant potential improvement inThe shovel cycle time = tc min Effective bucket load per pass of shovel = Bl = Bc Bf (100/(100+S)) te. No. of passes required to fill the smaller capacity dumper = n No. of passes required to fill the larger capacity dumper = n + m For single spotting condition, spotting time for both the dumpers = ts min For the smaller dumper, No. of Chap-4 Shovel Dumper PDF Truck Nature Scribd

احصل على السعر

SYSTEM ANALYSIS FOR SHOVEL-TRUCK PRODUCTIVITY

2.2.1.2. Shovel Productivity 31 2.2.2. Method Applying Queueing Theory 33 2.2.2.1. Queueing System Information 38 2.2.3. Computer Simulation Technique 40 2.2.3.1. Data Required For Stochastic Simulation 42 2.2.3.2. Selecting the Appropriate Distribution 45 3.0. DETERMINATION OFOPTIMUM SHOVEL-TRUCK COMBINATION Education. Shovel and dumper combination is a type of heavy equipment used in open cast mining operations. It is composed of two separate machines, a front-end loader (shovel) and a backhoe (dumper). The shovel is used to scoop ore, rock, or other materials out of the mine, while the dumper carries the load to a designated area for Shovel and Dumper Combinatio by Auqib Javed.pptx

احصل على السعر

Energy efficiency assessment of electric shovel operating in

The actual operating SPC of the electric shovel in an opencast coal mine of India is 0.14 kWh/cum whereas the minimum SPC is 0.12 kWh/cum for t idle = 0. Comparing the SPC with idle time and SPC without idle time, the energy saving potential is The spotting time of dumper is the time taken by it to position itself by the side of the. shovel for its loading. Normally, the spotting is done on one side of the shovel. The. spotting time generally ranges from 0.2 min to 0.5 min for rear dump trucks. depending on the operating conditions.Chapter 14 Shovel Dumper Estimation: Assumptions PDF

احصل على السعر

Dump truck operator vibration control in high-impact shovel

There was significant attenuation (38 to 57%) at 4 Hz for three Dumper seats, whereas they resonated in the range of 1.6–2.5 Hz. The transmissibility(%) in the resonating frequencies ranged from7. Calculation of Annual Digging Capacity of 7.65m3 Shovel No. Description Value 1. bucket size m3 7.65 2. fill factor for well blasted rock = 80% 0.80 3. average bucket capacity = 7.65 x 0.80 m3 6.12 4. swing time second 28 5. passes per minute, continuous operation 60/28 2.14 6. cubic metre per hour continuous 6.12 x 60/28 Transport & digging capacity calculation PPT SlideShare

احصل على السعر

(PDF) Virtual Simulation of High Impact Shovel Loading

Furthermore, it was demonstrated that by optimizing the dumping height of the shovel, the impact force can be reduced by 17.34% for the first shovel pass [18], and the resulting vibration levels

احصل على السعر